TDA pre qualified for Sognefjord Bridge study

( 12/23/2011 08:13 )

TDA was yesterday pre-qualified as part of a consortium with LMG Marin as one of several engineering groups that will evaluate a possible floating bridge solution to cross the Sognefjord.

Last updated: 12/23/2011 08:15